Commit Graph

5 Commits (aef508ff910a97bd6eeedd5fcb39a1b924998841)

Author SHA1 Message Date
Susan Douglas 8b2832bbc7 pgAgent docs. Fixes #1824 2016-10-04 14:48:57 +01:00
Ashesh Vashi e52aeecd20 Fixes# 1808 - Invalid date-time format was used in the Start/End time
for Job Schedule.

Thanks Susan for the report.
2016-10-04 10:18:37 +05:30
Dave Page d4af70aeb9 Label corrections. 2016-10-03 14:20:04 +01:00
Ashesh Vashi e591c6b5c0 pgAgent misc fixes:
1. When an existing schedule updated, or a new schedule is added from a pgAgent job dialog, it was not able to generate the proper update SQL Query.
2. The SubNodeCollectionControl was not removing the grid, when it is being getting removed.
2016-09-26 13:43:13 +01:00
Ashesh Vashi 237bfd4882 pgAgent - add modules for jobs, steps and schedules. Fixes #1341 2016-09-26 12:04:10 +01:00