Commit Graph

11 Commits (master)

Author SHA1 Message Date
Zhen Ye bb8d1ab3bf
enhance: make new go package to manage proto (#39114)
issue: #39095

---------

Signed-off-by: chyezh <chyezh@outlook.com>
2025-01-10 10:49:01 +08:00
tinswzy e76802f910
enhance: refine querycoord meta/catalog related interfaces to ensure that each method includes a ctx parameter (#37916)
issue: #35917 
This PR refine the querycoord meta related interfaces to ensure that
each method includes a ctx parameter.

Signed-off-by: tinswzy <zhenyuan.wei@zilliz.com>
2024-11-25 11:14:34 +08:00
wei liu 266f8ef1f5
fix: Search may return less result after qn recover (#36549)
issue: #36293 #36242
after qn recover, delegator may be loaded in new node, after all segment
has been loaded, delegator becomes serviceable. but delegator's target
version hasn't been synced, and if search/query comes, delegator will
use wrong target version to filter out a empty segment list, which
caused empty search result.

This pr will block delegator's serviceable status until target version
is synced

---------

Signed-off-by: Wei Liu <wei.liu@zilliz.com>
2024-11-12 16:34:28 +08:00
wei liu 55be814a58
enhance: make TransferChannel/TransferSegment idempotent (#36489)
issue: #36488
when call TransferChannel/TransferSegment, querycoord will generate and
submit balance task to scheduler, if segment/channel's task already
exist in scheduler, submit task will failed.

to make TransferChannel/TransferSegment idempotent, we should skip to
submit if task already exist in scheduler.

Signed-off-by: Wei Liu <wei.liu@zilliz.com>
2024-09-26 18:11:23 +08:00
congqixia 2fbc628994
feat: Support field partial load collection (#35416)
Related to #35415

---------

Signed-off-by: Congqi Xia <congqi.xia@zilliz.com>
2024-08-20 16:49:02 +08:00
wei liu e09dc3be58
enhance: Mark query node as read only after suspend (#35492)
issue: #34985 #35493
after querynode has been suspended, it's not allow to load
segment/channel on it, which means the node is read only. to be
compatible with resource group design, after query node has been
suspend, we remove it from it's original resource group, make it a read
only query node in replica. then two things will happens:
1. it's original resource group will be lacking of query nodes, query
coord will assign new node to it.
2. querycoord will try to move out all segments/channels after querynode
has been suspended

Signed-off-by: Wei Liu <wei.liu@zilliz.com>
2024-08-20 14:02:54 +08:00
wei liu 8123bea1ae
enhance: Avoid assign too much segment/channels to new querynode (#34096)
issue: #34095

When a new query node comes online, the segment_checker,
channel_checker, and balance_checker simultaneously attempt to allocate
segments to it. If this occurs during the execution of a load task and
the distribution of the new query node hasn't been updated, the query
coordinator may mistakenly view the new query node as empty. As a
result, it assigns segments or channels to it, potentially overloading
the new query node with more segments or channels than expected.

This PR measures the workload of the executing tasks on the target query
node to prevent assigning an excessive number of segments to it.

---------

Signed-off-by: Wei Liu <wei.liu@zilliz.com>
2024-06-27 19:06:05 +08:00
jaime 9630974fbb
enhance: move rocksmq from internal to pkg module (#33881)
issue: #33956

Signed-off-by: jaime <yun.zhang@zilliz.com>
2024-06-25 21:18:15 +08:00
wei liu 2013d97243
enhance: Enable to dynamic update balancer policy in querycoord (#33037)
issue: #33036
This PR enable to dynamic update balancer policy without restart
querycoord.

---------

Signed-off-by: Wei Liu <wei.liu@zilliz.com>
2024-05-21 14:29:39 +08:00
chyezh 48fe977a9d
enhance: declarative resource group api (#31930)
issue: #30647

- Add declarative resource group api

- Add config for resource group management

- Resource group recovery enhancement

---------

Signed-off-by: chyezh <chyezh@outlook.com>
2024-04-15 08:13:19 +08:00
wei liu 92971707de
enhance: Add restful api for devops to execute rolling upgrade (#29998)
issue: #29261
This PR Add restful api for devops to execute rolling upgrade, including
suspend/resume balance and manual transfer segments/channels.

---------

Signed-off-by: Wei Liu <wei.liu@zilliz.com>
2024-03-27 16:15:19 +08:00